We went through induction last weekend and got the card for the leisure center. Maybe we could bring our sporting suits and try the gym next time :)
Ok, big update --Floor tiles have been finished ! Kevin and I both like the color of bathroom.
Well, this is the main area, tiles are just so so. Color --doesn't look that good, hopefully be better after the cleaning. Size--- 400mm*400mm still looks small :(
Tuesday, April 27, 2010
Sunday, April 18, 2010
painting finished , tiles delivered !
It's a very beautiful weekend. Our house now looks much cozy under the sunlight. :P
All internal paining has been finished , color 's great. And we also found the tiles delievered already. With any luck, tiles will be spread on next week !
I don't have much confidence on the tiles we chosed, so am really looking forward to it .
All internal paining has been finished , color 's great. And we also found the tiles delievered already. With any luck, tiles will be spread on next week !
I don't have much confidence on the tiles we chosed, so am really looking forward to it .
Tuesday, April 13, 2010
is inspection necessary ?
I know it's a bit early. But looking at everything moving so fast now, I have to worry about the quality and thus final inspection before handover should be taken into consideration!
I really need a professional to give me some advice at least. Only one thing, does Carlisle will finally accept the inspection report which to some extent may need builder to re-do something ? ... ...
And just talked to our Carlisle admin , the PCI date has not been finalised but the very rough date would be somewhere around 20May! Is it that FAST ? !
I really need a professional to give me some advice at least. Only one thing, does Carlisle will finally accept the inspection report which to some extent may need builder to re-do something ? ... ...
And just talked to our Carlisle admin , the PCI date has not been finalised but the very rough date would be somewhere around 20May! Is it that FAST ? !
Sunday, April 11, 2010
lock up !
Our house was lock up from last Thursday, when the painting was scheduled in.
We received two invoices at the same time for fixing & lock up ! Well, they never got delayed in collecting the money :P
We went to the site on Saturday as usual and found bircks all finished awaiting for the rendering. Painting is going well up till now. It's said it would take about one week to get painting completed. So, so far so good. Everything's moving smoothly and the floor tiles should be expected at end of this month. Woohoo~~
I've taken one picture of the paint from outside window, very unclear though.
We received two invoices at the same time for fixing & lock up ! Well, they never got delayed in collecting the money :P
We went to the site on Saturday as usual and found bircks all finished awaiting for the rendering. Painting is going well up till now. It's said it would take about one week to get painting completed. So, so far so good. Everything's moving smoothly and the floor tiles should be expected at end of this month. Woohoo~~
I've taken one picture of the paint from outside window, very unclear though.
Monday, April 5, 2010
a few updates
nothing exciting , really. It's said the painting scheduled this Thursday if everthing gets fixed on time.
facade not finished yet
facade not finished yet
Wednesday, March 31, 2010
nothing more particular before the long Easter weekend
I got a call from our carlisle admin that the painting is scheduled next Thursday, and will probably finished in one week. So, the hub box thing must get moved before that. Actually, I guess everything needs to be fixed before paining anyway.
But I really don't think we can see the hub in the right position when we stop by this weekend. It takes time . In fact, it's not a big deal to me at all, becaue if the walk-in rack would be 5cm lower doesn't matter too much. But they insisted to relocate the hub by 5cm higer which should be the right height according to the final drawing.
So I just hope things get fixed in time without any damage so as not to miss the painting schedule.
Hopefull, more photos come in after we check it out this Easter weekend.
But I really don't think we can see the hub in the right position when we stop by this weekend. It takes time . In fact, it's not a big deal to me at all, becaue if the walk-in rack would be 5cm lower doesn't matter too much. But they insisted to relocate the hub by 5cm higer which should be the right height according to the final drawing.
So I just hope things get fixed in time without any damage so as not to miss the painting schedule.
Hopefull, more photos come in after we check it out this Easter weekend.
Saturday, March 27, 2010
got some colors in :)
I was told the kitchen cabinet has been installed yesterday. So, today we just could not wait to see it. Everything just became so quick.
Kitchen : ) I really like the color .
Kitchen : ) I really like the color .
Our ensuite.
Laundry
Bricks are still in progressing.