I just thought I should update something , but honestly, there's nothing much to write about. We have already received the occupance certificate and the final invoice as well. Went to the house last weekend, still found some outstanding issues on the facade needed to be rectified. So , what I can do now is only awaiting for the confirmation from my site supervisor and then book a time for final handover.
I admit I'm getting bit of lazy these days. I haven't got any quotes yet, nor driveway , landscape, blinds etc. My house and my neighbour's are the most quickest completion among the entire stage 12. Thanks to the rain recently , it gets more and more muddy around the whole area ! I don't think we could just move in like that ! But back to reality, it's almost time for doing the concreting, driveway and stepping into the mud for gardening, I knew it, and finally I will do it.
Thursday, June 17, 2010
Monday, May 31, 2010
PCI today!
When I arrived at the house, our inspector almost finished the external. So I still got the chance to go through with him for the internal items. Rob is very professional , nice and also very strict which was good anyway. He picked out many small things need to be fixed, like loose toilet, etc. I'm a careless person, so this independent inspection really helps me a lot.
The whole inspection took more than 2 hours before the actual PCI with my site supervisor. The PCI went very well, my site supervisor also helped to point out some small defects, like paintings, cabinet seals, etc. Just like Rob said, overall, everything is good except some minor items. That's comforting to hear . And those items are gonna be fixed , say in two weeks.
So far so good, Carlisle homes did a nice job.
The whole inspection took more than 2 hours before the actual PCI with my site supervisor. The PCI went very well, my site supervisor also helped to point out some small defects, like paintings, cabinet seals, etc. Just like Rob said, overall, everything is good except some minor items. That's comforting to hear . And those items are gonna be fixed , say in two weeks.
So far so good, Carlisle homes did a nice job.
Saturday, May 22, 2010
Close to finish .
Facade looking,garage door installed :
BUT, we've got the wrong colorbond flashing on the facade, it should be the same color as the fascia , now it's dark black! I have to call our site supervisor on Monday to get it changed. Hopefully, it will not affect the PCI on time due next weekend.
Sunday, May 16, 2010
new look
Now the house really takes on a new look with colored rendering :)
Carpet was all finised . Kitchen splashback was put on too ! I'm so excited to see the bright colors inside and outside as well.
PCI date was scheduled in the end of this month. Today, I've called my inspector and am trying to arrange a good time for both.
Here are some pics:
Sunday, May 9, 2010
BIG BIG internal change!
Went to our house this week , pretty close to finish ! The only thing I could think of needs to be done is the "carpet ". Walk-in robe, pantry, smart wiring, ducted heating, showers, bathtub, taps, downlights, downpipes...are all completed. So, are we supposed to have handover soon ?





Walk in
Heating control
Bathtub
ensuite
shower
smart wiring -home theatre
Tuesday, April 27, 2010
a few updates
We went through induction last weekend and got the card for the leisure center. Maybe we could bring our sporting suits and try the gym next time :)
Ok, big update --Floor tiles have been finished ! Kevin and I both like the color of bathroom.
Well, this is the main area, tiles are just so so. Color --doesn't look that good, hopefully be better after the cleaning. Size--- 400mm*400mm still looks small :(
Ok, big update --Floor tiles have been finished ! Kevin and I both like the color of bathroom.
Well, this is the main area, tiles are just so so. Color --doesn't look that good, hopefully be better after the cleaning. Size--- 400mm*400mm still looks small :(
Sunday, April 18, 2010
painting finished , tiles delivered !
It's a very beautiful weekend. Our house now looks much cozy under the sunlight. :P
All internal paining has been finished , color 's great. And we also found the tiles delievered already. With any luck, tiles will be spread on next week !
I don't have much confidence on the tiles we chosed, so am really looking forward to it .
All internal paining has been finished , color 's great. And we also found the tiles delievered already. With any luck, tiles will be spread on next week !
I don't have much confidence on the tiles we chosed, so am really looking forward to it .