Monday, May 31, 2010

PCI today!

When I arrived at the house, our inspector almost finished the external. So I still got the chance to go through with him for the internal items. Rob is very professional , nice and also very strict  which was good anyway.  He picked out many small things need to be fixed, like loose toilet, etc.  I'm a careless person, so this independent inspection really helps me a lot.
The whole inspection took more than 2 hours before the actual PCI with my site supervisor. The PCI went very well, my site supervisor also helped to point out some small defects, like paintings, cabinet seals, etc.  Just like Rob said, overall, everything is good except some minor items.  That's comforting to hear . And those items are gonna be fixed , say in two weeks. 
So far so good, Carlisle homes did a nice job.

Saturday, May 22, 2010

Close to finish .

Facade looking,garage door installed :
BUT, we've got the wrong colorbond flashing on the facade, it should be the same color as the fascia , now it's dark black! I have to call our site supervisor on Monday to get it changed. Hopefully, it will not affect the PCI on time due next weekend.

Sunday, May 16, 2010

new look



Now the house really takes on a new look with colored rendering :) 
Carpet was all finised .   Kitchen splashback was put on too ! I'm so excited to see the bright colors inside and outside as well.  
PCI date was scheduled in the end of this month. Today, I've called  my inspector and am trying to arrange a good time for both.
Here are some pics:





Sunday, May 9, 2010

BIG BIG internal change!

Went to our house this week , pretty close to finish ! The only thing I could think of needs to be done is the "carpet ".  Walk-in robe, pantry, smart wiring, ducted heating, showers, bathtub, taps,  downlights, downpipes...are all completed.   So, are we supposed to have handover soon  ?


Walk in




Heating control




Bathtub




ensuite




shower




smart wiring -home theatre